Services in a building act as its backbone. A well-executed project is the one in which all the services as well coordinated with each other and serve the building in the rightful manner. The workable drawings on the site are sent in the 2D format.
Mechanical plant room is the space in a building that is solely dedicated to the equipment linked to the mechanical services and the relevant associated electrical equipment.
Quantity takeoff is a typical job especially in complex projects like that of a hospital where a lot of elements are used. Quantity takeoff is a time taking process that needs high level of accuracy so as to estimate the magnitude of work and the cost of project.
Infrastructure is the nervous system of a project hence, getting a well-connected and planed infrastructure in a project is very crucial.
BIM can be implemented in all kinds of construction projects – residential, commercial, industrial, and so on. VDC technologies took up a project for BIM in an infrastructure project for Airport Taxiway.